Yesterday, the two remaining spool pieces were moved into the cleanroom. One spool was attached to BSC9 and a second spool added to fill in the gap between BSC9 and BSC5. Since BSC5 already had a spool piece attached, it was possible to marry the three spool pieces and complete the beam tube between the chambers.