BSC 3 now has its HEPI housing installed and locked in place. The blue-iron brackets are still in place for now but will be moved to BSC 8 for swapping back in the iLIGO stacks. The hydraulic actuators on BSC 8 will also be moved over to BSC 3. One bolt had galled on BSC 8 horizontal actuator but was cut out. After removal the HEPI foot will need to be fixed.