Maintenance activites ended just before noon, and then locking commenced. (times in UTC)
1855: Started initial alignment.
- Requested the INITIAL_ALIGNMENT state from ISC_LOCK. This gave the INIT_ALIGN node control and it began aligning the green arms.
- The INIT_ALIGN node did the entire alignment except for a few small tweaks for the green alignment. The rest of the alignment I just monitored to make sure there was no funny business.
1907: Inital alignment complete, starting locking.
- Quickly got to a locked PRMI, then 5min later a DRMI. ASC here was a big far off so we opted to wait it out a bit to make sure the signals were well settled. After a handful of minutes we lost lock for no apparent reason.
- Repeated the above with the same outcome.
- Repeated the above with sucess. Did nothing different, nor do we know why we were losing DRMI.
2038: Reached DC Readout.
- Here we will stop for some commissioning work.
Swept EndX
Swept EndY