Preparation for installation of the X-mid Turbo Pump Station

7/1/2019

Richard M., Filiberto C., Kyle R.

Richard M. and Filiberto C. lifted the 208VAC 3ph wiring that had supplied the iLIGO MTP Turbo Pump.  This alllowed me to fully remove the conduit stub+unistrut and Hubble connector from the VEA floor.  Additionally, I removed the MTP - QDP80 signal cable junction box+conduit+unistrut support which was mounted on the VEA floor in the same facinity.  These items had intruded into the footprint of the pending installation of the new Turbo Pump Station. 

7/2/2019

Gerardo M., Kyle R.

Today we cored the holes and installed the adhered threaded inserts into 3 of the 4 anchor locations which will be used to anchor the new Turbo Pump Station.  The existing MTP Turbo support stand interferred with the location of the 4th new anchor (we can do this one on the day of the Turbo Pump Station installation.