TITLE: 07/06 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Seismic
INCOMING OPERATOR: Patrick
SHIFT SUMMARY: locked until earthquakes in California
LOG: al times in UTC
- 3:20:51 - incoming EQ
- 3:22:10 - SEI config to Earthquake
- 3:22:37 - H1 lost lock
- 3:22:46 - first trip - BS stage 2
- 3:23:19 - SEI config to Very Large Earthquake
- 3:26:06 - last trip
- 3:26:21 to 6:55:06 - 21 additional incoming earthquakes announced
TO DO:
- since the IMC locked with MC1 tripped, the position of the MC2 is off in yaw by 10s of urad
- all IMC optics should be checked before relocking the IMC
- the IMC WFS did move, but clearing them would cause more misalignment than is present now, so advised Patrick to leave the WFS as is, and reset IMC optics with slifers
- IM1, IM2, IM3, and IM4 also need to be checked once the HAM2 ISI is isolated
- current SEI ISI config is still Very Large Earthquake