Reports until 00:22, Saturday 06 July 2019
LHO General
patrick.thomas@LIGO.ORG - posted 00:22, Saturday 06 July 2019 (50411)
Ops Owl Shift Transition
TITLE: 07/06 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Seismic
OUTGOING OPERATOR: Cheryl
CURRENT ENVIRONMENT:
    Wind: 12mph Gusts, 11mph 5min avg
    Primary useism: 0.41 μm/s
    Secondary useism: 0.17 μm/s 
QUICK SUMMARY: Unlocked. Riding through earthquakes.