TITLE: 07/07 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 115Mpc
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
After all 3-detectors went down after the EQ, Virgo is still down and in a "troubleshooting" state. Other than the big EQ, it was a fairly straightforward shift for the 2nd half of the shift.
LOG:
- 15:20 Incoming EQ alarm (listed as "large earthquake")
- 15:24 Switched to EARTHQUAKE state since I saw signals fairly fast on ndscope & StripTool signals. We'll see how it rides this out.
- 15:53 Lockloss & switched to LARGE_EQ_NOBRSXY
- 16:37 Back to WINDY
- 17:05 Lock #1 Finally Y-arm is able to hold for green arm.
- 17:07 Lockloss: PRM lockloss during ASC....
- 17:24 Lock#2: Lockloss at LOCKING ALS at 17:27.
- 17:28 Lock#3: Another one at LOCKING ALS at 17:30.
- 17:31 Going for initial alignment!
- 17:31-17:52 green arms
- 17:52-17:54 Input align
- 17:54-17:57 prc align
- 17:57-18:03 Mich Brigh
- 18:03-18:07 src align
- 18:09 Lock#4: Lockloss at CARM to TR at 18:26
- 18:26-19:09 #5 Back to OBSERVING!
- 21:44-21:53 TCS Chiller top off (FAMIS by corey)