Reports until 07:59, Tuesday 09 July 2019
LHO General
patrick.thomas@LIGO.ORG - posted 07:59, Tuesday 09 July 2019 (50458)
Ops Owl Shift Summary
TITLE: 07/09 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: Remained locked and in observing. No issues.
LOG:

11:59 UTC SEI_CONF to EARTH_QUAKE for earthquake in Japan
12:14 UTC SEI_CONF to WINDY
12:47 UTC SEI_CONF to EARTH_QUAKE for earthquake in Philippines
13:08 UTC LLO going down for maintenance
14:00 UTC SEI_CONF to WINDY
14:45 UTC Dropped out of observing to run PEM injection script. Observatory mode set to calibration.
14:53 UTC PEM injection script done. Observatory mode set to preventative maintenance.
14:54 UTC SEI_CONF set to SC_OFF_NOBRSXY