GPS error at EX cleared
Daniel:
Power cycling the CNS-II clock at EX cleared its error.
Operator outbuilding-camera-viewer workstation replaced
Dave:
The imac at the operator station (operator2) was broken. I replaced it with a temporary nuc (nuc18) until its permanant zotac is available.
EDC and DAQ Restart
Dave:
I restarted h1edc and the DAQ to acquire Daniel's new Beckhoff channels. This is a delayed restart, it should have happened last Tuesday. 430 INFO channels were added covering all PLCs.
Here is a new medm screen with a summary of the info channels.