Ops Shift Log: 07/09/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Commissioning
Support: Sheila
Incoming Operator: TJ
Shift Summary: After the maintenance window, tried relocking the IFO. Had problems in the initial stages and lost lock at FIND_IR. Ran an Initial Alignment using the automated process. This went very smoothly, as Sheila and I had realigned ALS by hand. After the initial alignment, relocked the IFO on the first attempt, without operator intervention. Relocked at NLN and turned over to Commissioning.
Had a GRB Alter, which was ignored because the Trigger Duration was 4.096
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Patrick
15:03 (08:03) Karen – Going to End-Y
15:31 (08:31) Sundae – Going into the Optics Lab
15:33 (08:33) Richard – Going to End-Y to work on phones
15:47 (08:47) Sundae – Out of the Optics Lab
15:55 (08:55) Vanessa – Going into the LVEA
16:01 (09:01) Kyle & Gerardo – Going into LVEA to survey turbo pumps
16:01 (09:01) Dick – Going into the LVEA
16:02 (09:02) Rick & Co. – Going to End-X to look at NCal stuff
16:19 (09:19) Karen – Finished at End-Y
16:22 (09:22) Jeff & Charles – Going to Mid-X to work on safety inspection
16:29 (09:29) Norco – Two tankers on site with N2 delivery to CP1 and CP6
16:45 (09:45) Marc – Going into LVEA to assist Dick G.
17:00 (10:00) Chris – Going into the LVEA
17:03 (10:03) Filiberto – Back from End-X
17:03 (10:03) Rick & Co – Finished at End-X
17:04 (10:04) Vanessa – Out of the LVEA
17:04 (10:04) Vanessa – Going to End-X
17:17 (10:17) Jason – Going into the PSL enclosure for property inventory
17:18 (10:18) Chris – Out of the LVEA
17:22 (10:22) Jason – Out of the PSL enclosure
17:41 (10:41) Niko – Going to End-X to look at viewports
17:54 (10:54) Christina – Going to Mid-X and End-X for inventory
18:12 (11:12) Niko – Finished at End-X going to End-Y for viewport check
18:15 (11:15) Dave – DAQ restart
18:28 (11:28) Kyle & Gerardo – Finished in LVEA
18:30 (11:30) Amber – Taking tour through LVEA
18:36 (11:36) Dick G. – Taking a tour through the LVEA
18:55 (11:55) Amber – Tour out of the LVEA
19:15 (12:15) Jeff B. – Sweep the LVEA
19:33 (12:33) Filiberto – Both end stations swept
19:39 (12:39) Try locking – Adjust ALS X and Y
20:07 (13:07) Peter & Sundae – Out of the Optics Lab
20:29 (13:29) Lock loss at FIND_IR – Alignment not looking good
20:30 (13:30) Start Auto Initial Alignment
20:54 (13:54) Initial Alignment finished
20:56 (13:56) Start Locking
21:32 (14:32) Locked at NLN
21:35 (14:35) In COMMISSIONING mode
22:21 (15:21) Peter & Sundae – Going into the Optics Lab
22:38 (15:38) GRB Alert – LHO only site up – Trigger Duration 4.096 – Ignore
23:00 (16:00) Turn over to TJ