SHIFT SUMMARY:
Started out shift with an earthquake. Then went out of OBSERVING for a Calibration measurement, and calibration work also caused a lockloss. Handing off an unlocked H1 to Ed.
NOTE: Just made it through DHARD_WFS, but if we had trouble with it, Sheila let Niko/us know that we can REVERT RF45 channels in ASC_IMC....but hopefully we are OK with this.
LOG:
- 15:03 Lockloss due to 5.3 Oregon earthquake
- 15:07 ISI_CONFIG taken to LARGE_EQ_NOBRSXY
- 15:24 Taken to EARTHQUAKE
- 15:29 Taken to WINDY (got there at 15:31)
- 15:30-15:52 ALS Fiber polarization adjustment
- Lock #1
- Took time to reduce fiber polarizations
- For locking, first adjusted fiber polarization & then took DOWN since was stuck at FIND_IR.
- Lock #2
- PRMI used
- DRMI locked after I clicked SRM in yaw 2-clicks
- 16:20:18utc BUT, DRMI was driven out of lock while we noticed OM1 & OM2 saturations (via verbal & on saturation screen)
- Lock#3 (after DRMI lockloss above)
- DRMI reacquired on its own and selected NLN & it made it all the way up.
- SDF tiny diffs for ISS Refsignal, ETMy Drivealign & MC3 pit/yaw offsets
- 16:30 Rock moving at LSB. Bubba called about it and I did not see anything on seismometer trends. Said this should be roughly an hour. (Bubba)
- 16:58 OBSERVING
- 20:00 Out of OBSERVING: Wednesday Calibration (JeffK)
- 21:58:47 Lockloss due to calibration
- Lock#1
- ALSy: tweak ETMy & TMSy
- 22:32:18 Lockloss at CARM_TO_TR
- Lock#2
- Taken to PRMI twice.....so decided to align just SRC.
- Lock#3
- froze twice at FIND_IR, but now is moving on past DRMI.
- 22:23-22:40 Shutting off HVAC in CER (Richard)