Reports until 17:00, Thursday 10 January 2013
H1 CDS
david.barker@LIGO.ORG - posted 17:00, Thursday 10 January 2013 (5072)
LSC install, sush2a,34 IOP changes, LVEA front ends and PEML0

Completed the LSC install for mode cleaner support. IPC between LSC and MC2 was installed, h1susmc2 model changed to ingest LSC control signal.

The iop models h1iopsush34 and h1iopsush2a were changed to restore the WD bypass time back to 600 seconds, closing out WP 3576.

All the LVEA test stand frontends were restarted following SEITEST binary IO work.

A new h1peml0 model was installed, removing filter modules which are not needed and changing some names. At one point h1oaf0 crashed and disrupted the DAQ data from h1susb6,bstst and h34. The streamers were restarted on these front ends and all DAQ data now looks good.