TITLE: 07/23 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Travis
SHIFT SUMMARY:
During a fairly busy Maintenance, I did not hear that the TCSy laser went off at 11:42am. Noticed it at about 2:14pm, so ITMy was cold for almost 3hrs. These extra hours of downtime needed to heat up ITMy were totally my fault!
LOG:
- Fire Dept is at EY (expect errant readings & alarms for EY vacuum gauges due to FPD radios)
- 15:00 Fan Maintenance (Bubba)
- 15:01 Transitioned to SC_OFF_NOBRSxy (Corey)
- Had lockloss at same time
- 15:05-18:49 Y-beam manifold VAC work (Kyle)
- 15:05-19:55 48Hz work prep (PEM crew)
- 15:05 HEPI/Dust (Jeff)
- 15:13 VAC cabling (Gerardo + Fil)
- 15:15 PSL Cleaning (Peter, Vanessa, Karen)
- 15:17 Film crew on site/in LVEA(Amber)
- 15:22 Photos in PSL room (Cheryl)
- 15:56 SEI HAM blend work (Jim)
- 16:03 CER ISC racks measurements (Matthew, Dick)
- 16:07-17:12 PSL Pump diode current work (Jason)
- 16:12-18:08 EY CP7 LN2 fill (Norco)
- 16:49 EY camera work (Richard)
- 16:50 LVEA CP2 LN2 fill (Norco)
- 16:55 Photos at EX (Timesh)
- 16:57 Looking for stuff in LVEA (Hugh & Bubba separately)
- 17:15 Looking for EY beam profile parts in Optics Lab (Jason)
- 17:34 Refl port work (Daniel)
- 17:35-1900 Beam Profiling at EY (Jason)
- 18:17-18:58 Out building HVAC filter swaps (Chris)
- 19:25 Checking alsY shutter (fil, richard)
- 20:00 Start locking
- 20:33 Initial Alignment
- Discovered TCSy Laser was OFF. Related to temperature interlock trip. (TCSy Tripped at 18:42utc/11:42amPDT.)
- Jason reset the controller out on the floor in the LVEA and this brought us back.
- 21:00 Starting locking
- ALS was fine
- PRMI had issues: very low POP18/90 (but they were very slowly trending up)
- This was due to a cold ITMy!
- Managed to eventually lock DRMI, but had a lockloss at ENGAGE_SOFT_LOOPS
- 22:23 Removing an accelerometer in LVEA (Adrian & Matthew)