Reports until 17:28, Thursday 10 January 2013
H1 PEM
james.batch@LIGO.ORG - posted 17:28, Thursday 10 January 2013 (5073)
Installed new front end computer at Mid X
Installed network switches, h1pemmx computer, timing fanout, IRIG-B chassis, I/O chassis, and AA chassis in the Mid X VEA.  Tested switches and computer, they are operational.  The entire system is waiting for DC power and a connection from the vault seismometer to the AA chassis to start data collection.