[Keita K., Cheryl V., Kiwamu I., Chris M., Paul F.,]
Today's progress on IOT2L:
-
The beam tubes from the HAM2 viewports to IOT2L MCrefl and MCtrans paths were installed. This should mean that we don't have to be in laser hazard so much for a while from now.
-
MC refl beam was aligned onto the MCrefl RF PD. We are just missing the RF cables from the IOT2L patch panel to the demodulator board; once we have these we should be able to see length error signals. MC refl PD is cabled up inside IOT2L.