TITLE: 07/25 Owl Shift 07:00 – 15:00 (00:00-08:00), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: TJ
SHIFT SUMMARY: Still working to recover from power glitch yesterday. Locklosses continue at INCREASE_POWER, despite trying a few recommended changes by commissioners. Since my mid-shift post, I tried letting the violin modes ring down before increasing power (only got down to ~4.5 and lasted the longest of any attempts), realigned the OM’s to previous lock values, and tested that the IMC stays locked when powering up to 10 W (and that PWR_SCALE matches power).
LOG:
07:00 (00:00) Start of shift
07:16 (00:16) Starting initial alignment
07:36 (00:36) Initial alignment complete, starting re-lock
07:55 (00:55) Lockloss at CARM_TO_TR, looks like we lost DRMI while ramping down LSC-REFL_SERVO_IN2GAIN.
08:43 (01:43) Lockloss from INCREASE_POWER, after waiting at ENGAGE_DC_VIOLINS for ASC channels to converge
09:38 (02:38) Lockloss from INCREASE_POWER after reducing MICH_P gain by 70%
13:04 (06:04) Lockloss from INCREASE_POWER after waiting for violins to go down a bit
14:47 (07:47) Lockloss from INCREASE_POWER after aligning OM’s to previous config (to reduce AS_A_NSUM)
15:00 (08:07) End of shift