TITLE: 07/25 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Travis
SHIFT SUMMARY: Currently commissioning in low noise. Lock reaqusition was a bit tricky, ALSX WFS would pull away whenever it would lock. I got around this by turning off the DOF1 P filter and then turning it on after the rest of the WFS had settled down a bit. Then DRMI looked well aligned and had good triggers, but it just wouldn't hold. An automatic PRMI, then a bit of SRM Y finally let us aquire DRMI. Violin mode 13 on ITMX is a bit elevated, and I have yet to find a good gain/phase setting. Hopefully Travis can crush this mode.
LOG: