We run the Phase 1b transfer functions on the M1 level of the India HLTS PR3. The plots are posted in the attached files. The undamped results are in the files from 01/11/2013, the damped results are in the files from 01/10/2013. The results look good. If there are no issues with these data, we will run the power spectra tests.