Displaying report 1-1 of 1.
Reports until 15:32, Friday 11 January 2013
H1 SEI
hugh.radkins@LIGO.ORG - posted 15:32, Friday 11 January 2013 - last comment - 13:54, Monday 14 January 2013(5082)
WBSC1 IAS/HEPI
IAS has given me numbers.  I am unable to move HEPI the requested amount (8mm -X) until the East side Caging Brace Front Faces are moved (removed).  Hopefully we'll be able to reinstall these which allows the HEPI to be locked.  Once this is done we can attempt the translation East.  I believe there is room otherwise for this move.  Caveat: The Actuators are not attached; they have interferences that are not directly determinable now.
For the record, contrary to many statements from SEI to date, BSC1 has only been marginally locked if it can be said it was locked at all.  Most lock bolts were not engaged and only a few of the 40 were doing anything.
Comments related to this report
betsy.weaver@LIGO.ORG - 13:54, Monday 14 January 2013 (5095)

Correction:  The error is in the -Y direction, not -X.

Displaying report 1-1 of 1.