TITLE: 08/01 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC STATE of H1: Corrective Maintenance INCOMING OPERATOR: Jeff SHIFT SUMMARY: Jenne, Jeff K., and Keita continued troubleshooting. Kara and I worked on damping ETMY mode 1 and 6. Eventually was able to damp with ETMY mode 1 set to -60 deg phase, .3 gain., and mode 6 set to 0 gain. Jenne is still troubleshooting at the end of the shift. LOG: 00:07 UTC Timesh out of optics lab 00:15 UTC Ethan and Laurence to optics lab 01:01 UTC Ethan out of optics lab 03:28 UTC Timesh to optics lab