Reports until 00:10, Thursday 01 August 2019
H1 General
jeffrey.bartlett@LIGO.ORG - posted 00:10, Thursday 01 August 2019 (50956)
Ops Owl Shift Summmary
Ops Shift Transition: 08/01/2019, Owl Shift 07:00 – 15:00 (00:00 -08:00) - UTC (PT)
State of H1: Unlocked
Intent Bit: Corrective Maintenance
Weather:  It is a clear and starry morning. No rain in the forecast, Winds are a Calm to Light Breeze. Temperatures are in the low 70s to mid-60s.  
Primary 0.03 – 0.1Hz: 0.009um/s
Secondary 0.1 – 0.3Hz: 0.03um/s
Outgoing Operator: Patrick
Quick Summary: IFO is unlocked after an earthquake induced lockloss. Jenne has been working with Patrick on relocking.