TITLE: 08/01 Day Shift 15:00 – 23:00 (08:00-16:00), all times posted in UTC
STATE of H1: Corrective Maintenance
INCOMING OPERATOR: Patrick
SHIFT SUMMARY: Started shift in Observing and was eventually knocked out of lock by a 6.6 EQ in Chile, which took about 3 hours to ring down. Went through the locking process without initial alignment, managed to get to NLN. Commissioners are currently driving.
LOG:
15:00 (08:00) Start of shift
15:06 (08:06) Ethan, Timesh to Optics Lab
15:12 (08:12) Timesh out of Optics Lab
15:17 (08:17) Karen to Optics Lab
15:38 (08:38) Ethan out Optics Lab
15:42 (08:42) Karen out of Optics Lab
17:30 (10:30) Out of Observing for calibration measurement
17:47 (10:47) Laurence, Dripta to Optics Lab
18:17 (11:17) Calibration measurement complete, going back to Observing
18:33 (11:33) Switching to EQ config for 6.5 in Chile
18:44 (11:44) Laurence out of Optics Lab
18:52 (11:52) Lockloss from EQ
20:09 (13:09) Dripta out of Optics Lab
21:02 (14:02) Ethan to Optics Lab
21:05 (14:05) Timesh to Optics Lab
21:08 (14:08) Timesh out of Optics Lab
21:14 (14:14) Ethan out of Optics Lab
22:03 (15:03) At NLN, holding there for corrective maintenance
23:00 (16:00) End of shift