I rebooted h2adcumy. To facilitate removal of passive ISI in BSC4: Doors were hung back on HAM12 Clean room around BSC4 was rotated 90 degrees Clean room around HAM12 was moved to HAM10 Oscar was bailing tumbleweeds. An electrician was scheduled to install motorized variac on 2 stages of VEA Heat at Mid X. (Richard) A vendor from Craftsman Cabinets was scheduled to arrive at 10:00am. (Michael R.)