TITLE: 08/05 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY: Currently recovering from a commissioning lock loss, ending a 33 hour lock. I ran initial alignment because DRMI and PRMI looked awful. During the IA, I had to move PRM tens of urads in pitch to get PRC to lock.
LOG: