Reports until 00:37, Tuesday 06 August 2019
H1 General
corey.gray@LIGO.ORG - posted 00:37, Tuesday 06 August 2019 (51046)
Transition to OWL Log

TITLE: 08/06 Owl Shift: 07:00-15:00 UTC (00:00-08:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
OUTGOING OPERATOR: Cheryl
CURRENT ENVIRONMENT:
    Wind: 5mph Gusts, 3mph 5min avg
    Primary useism: 0.01 μm/s
    Secondary useism: 0.04 μm/s
QUICK SUMMARY:

Cheryl was recovering from a Montana EQ when I walked in, but looks like we still have issues which are tied to previous locking issues before her shift.

Cheryl mentioned there were no trips or other obvious bad things from the EQ, but she did mention issues with the alignment, so she went for an Initial Alignment, but there have been issues at the PRC alignment step.  (and I still need to read the alogs from Jenne & crew regarding PR issues from previous locking attempts).

Since this looks like a non-standard issue, I switched OBSERVATORY MODE to the CORRECTIVE MAINTENANCE state at7:11utc to mark down time.