Reports until 16:06, Tuesday 06 August 2019
H1 General
edmond.merilh@LIGO.ORG - posted 16:06, Tuesday 06 August 2019 (51057)
Shift Summary - Day

TITLE: 08/06 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 115Mpc
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:

Maintenance day. Most tasks completed despite 25 minute delay in starting. There was a slight issue with re-locking the mode cleaner due to a lack of communication regarding taking the IMC down before taking all the ISIs down. H1 crecovered relatively easy after that following some ASC tweaks by Jenne. Handing off to Cheryl
 

LOG:

14:56 Peter out to optics lab

15:05 Karen and Vanessa to ends

15:06 HFD on site

15:06 Sensor correction off

15:08 Adrian and Matt out to LVEA to pull cables by Y manifol;d

15:08 ACE on site

15:10 Sigg ou to LVEA

15:16 Chandra out to LVEA

15:18 Adrian and Matt back

15:19 Ken headed to EX - emergency lighting

15:28 Chris out to LVEA with HFD

15:36 Ethan and Niko out to optics lab

15:39 Chris/HFD back - out to EX to begin IFO wide inspections

15:44 Jeff B out for sitewide dust monitor inspections

15:47 IMC is relocked after safe.snap work by Hugh - the spots look much different then pre-work. Letting WFS hanndle it.

15:57 IMC looking better

16:02 Richard out to LVEA - stay clear for cameras

16:05 Niko and Adrian back

16:21 Jason out to EY for ALS Beam Profiling

16:25 Rahul ending EY charg measurement earlyto make way fo Pcal Work

16:26 Chris out to LVEA - pest control

16:27 Niko, Laurence, Ethan, and Dripta to EY for PCal work

16:43 Chris/pest back - out to Y arm

16:54 Richard back

16:58 Ken back from EX and headed to EY - emergency lighting

17:19 Norco on site - #74 - MidY

17:35 Chris back - pest control done

17:41 TJ out to LVEA

17:46 Gerardo back

17:47 Jason Back

17:48 ITMY model restart and ITMY ISI and SUS recovery - done

17:49 Marc out to to LVEA to join Dick

18:00 TJ out to transition LVEA to LASER HAZARD

18:04 Sigg out to LVEA

18:09 Hugh finished craning

18:14 LVEA is LASER HAZARD

18:36 Gerardo out to LVEA to turn off a pump

18:46 Richard out to LVEA w/Hugh and Gerardo

18:47 Timesh out to optics lab

18:55 SEI_CONF back to Windy

19:11 Gerardo, Hugh, and Richard back

19:13 MC1, PRM, and PR2 CDS Difital Cameras not working - Dave restarting processes

19:16 Dick and Mrc back  - PCAL team is back for a while now

19:18 All tasks completed - Begin Alignment/Recovery

21:50 H1 Observing