TITLE: 08/06 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 115Mpc
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
Maintenance day. Most tasks completed despite 25 minute delay in starting. There was a slight issue with re-locking the mode cleaner due to a lack of communication regarding taking the IMC down before taking all the ISIs down. H1 crecovered relatively easy after that following some ASC tweaks by Jenne. Handing off to Cheryl
LOG:
14:56 Peter out to optics lab
15:05 Karen and Vanessa to ends
15:06 HFD on site
15:06 Sensor correction off
15:08 Adrian and Matt out to LVEA to pull cables by Y manifol;d
15:08 ACE on site
15:10 Sigg ou to LVEA
15:16 Chandra out to LVEA
15:18 Adrian and Matt back
15:19 Ken headed to EX - emergency lighting
15:28 Chris out to LVEA with HFD
15:36 Ethan and Niko out to optics lab
15:39 Chris/HFD back - out to EX to begin IFO wide inspections
15:44 Jeff B out for sitewide dust monitor inspections
15:47 IMC is relocked after safe.snap work by Hugh - the spots look much different then pre-work. Letting WFS hanndle it.
15:57 IMC looking better
16:02 Richard out to LVEA - stay clear for cameras
16:05 Niko and Adrian back
16:21 Jason out to EY for ALS Beam Profiling
16:25 Rahul ending EY charg measurement earlyto make way fo Pcal Work
16:26 Chris out to LVEA - pest control
16:27 Niko, Laurence, Ethan, and Dripta to EY for PCal work
16:43 Chris/pest back - out to Y arm
16:54 Richard back
16:58 Ken back from EX and headed to EY - emergency lighting
17:19 Norco on site - #74 - MidY
17:35 Chris back - pest control done
17:41 TJ out to LVEA
17:46 Gerardo back
17:47 Jason Back
17:48 ITMY model restart and ITMY ISI and SUS recovery - done
17:49 Marc out to to LVEA to join Dick
18:00 TJ out to transition LVEA to LASER HAZARD
18:04 Sigg out to LVEA
18:09 Hugh finished craning
18:14 LVEA is LASER HAZARD
18:36 Gerardo out to LVEA to turn off a pump
18:46 Richard out to LVEA w/Hugh and Gerardo
18:47 Timesh out to optics lab
18:55 SEI_CONF back to Windy
19:11 Gerardo, Hugh, and Richard back
19:13 MC1, PRM, and PR2 CDS Difital Cameras not working - Dave restarting processes
19:16 Dick and Mrc back - PCAL team is back for a while now
19:18 All tasks completed - Begin Alignment/Recovery
21:50 H1 Observing