Reports until 16:28, Monday 14 January 2013
LHO General
Link
michael.rodruck@LIGO.ORG -
posted 16:28, Monday 14 January 2013
(5106)
Ops summary
Ken working at end stations installing plastic hose for cables
Cable installation work on IOT1
Hugh working on L4Cs by HAM2. The light pipe shutter was closed for this work, making the area laser safe
Dave and Jim working on rebuilding SEI models
Cheryl increased the power into the beam tube to 210mW