{Gerardo, Chandra}
From roughly 9am to 10:30 am local, we core drilled the three accessable holes at vertex turbo station on OMC tube near HAM5. Interferences prevented us from drilling the remaining two marked holes at XBM turbo station. We left the 100' long water hose in squeezer bay temporarily until this exercise is complete.