Continued work on power cables for NCAL installation. Today, a junction box was placed on the FAC rack in the VEA. Junction box helps transition the 8 awg field power cable to our standard 3W3 power connectors. As of now, no power supplies have been installed in the VDD rack.
To make room on top of the VEA rack the old laser kill circuit box was removed.
F. Clara, P. King