TITLE: 08/08 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 113Mpc
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
Some commissioning issues with the squeezer laser power and there was a Superevent. See previous aLogs.
LOG:
15:14 Initial Alignment
15:39 Re-Locking attempt
16:27 NLN
16:32 H1 Observing
17:15 Joe B called to inform me that one of our squeezer temps was railing
17:24 H1 out of Observing - Squeezer unlocked - I'm flagging this as corrective maintenance as Daniel and Keita are on it.
17:54 DS and co, out to LVEA to remedy low squeezer laser power.
21:01 H1 into Commissioning mode to address squeezer issues and PRCL/SRCL FF issues
22:27 NLN
22:27 H1 back to Observing
22:27 Superevent S190808 aka G346647
23:00 Handing off to Cheryl