Ops Shift Log: 08/10/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN, 114.5Mpc range
Intent Bit: Observing
Support: N/A
Incoming Operator: Niko
Shift Summary: 2 GRB Alerts – Both good trigger duration and latency. All detectors observing. Stopped injection, spoke with LLO and did a 60 minute stand down.
Had some issues with the Squeezer conversion efficiency, which effected the range. Although it has not corrected itself, it is improving and as such, the range is improving.
Had several Saturday site tours come through the control room.
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from Patrick
16:12 (09:12) GRB Alert – Trigger Duration = 0.128sec, Latency = 18.76 seconds
Confirm with LLO, stop injections and stand down for 60 minutes
17:20 (10:20) Restart injection after GRB Stand down
17:30 (10:30) Range drop and SQZ conversion efficiency error
17:55 (10:55) Deisy – In the CR to prep for Saturday tours
13:15 (12:15) Saturday site tours underway
21:15 (14:15) Dave B – Getting high temp alarm from End-Y – He is calling support
22:41 (15:41) GRB Alert – Trigger Duration = 0.016, Latency = 19.49 seconds
Confirm with LLO, stop injections, & stand down for 60 minutes
22:50 (15:50) Last site tour in CR
23:00 (16:00) Turn over to Niko