Today was split between me, Pablo, and Patrick at the end of the day
-
Rick and I assembling Pcal mounts by H2 PSL
-
Kyle leak checking at HAM2
-
Jim working on SEIH!6
-
Dave working on ASC IMC system
-
Patrick replaced dust monitor 15
-
Praxair delivered to CP6 (MX)