I borrowed a gray tripod post which was sitting at the entrance of the LVEA. It is in the squeezing area right now and there is a beam profiler sitting on top of it. It would be great if we could keep both the tripod and the beam profiler in the sqz area for a few days next week. If it is a problem, let me know.