Displaying report 1-1 of 1.
Reports until 09:03, Friday 16 August 2019
H1 SQZ
daniel.sigg@LIGO.ORG - posted 09:03, Friday 16 August 2019 (51313)
New squeezer laser so far so good

Since the squeezer laser was swapped on Tuesday, the light powers have been stable out of the new laser and out of the SHG. The msyterious CLF power jumps are still with us. We will have to check the electrical connections next, or maybe swap the RF amplifier which drives the AOM.

Images attached to this report
Displaying report 1-1 of 1.