TITLE: 08/20 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Commissioning
INCOMING OPERATOR: Jeff
SHIFT SUMMARY: Recovered from maintenance and locked at NLN. See Jeff K's alog for more details with recovery.
LOG:
- 1501 Chris to LVEA for FAMIS tasks
- 1503 Kyle to LVEA to start staging equipment for hammer drilling
- 1506 lock loss
- 1506 Vanessa to EX
- 1513 Karen to EY
- 1514 Cheryl to LVEA to transition to laser safe
- 1517 Bubba and contractor to LVEA near HAM5/6
- 1522 Richard back
- 1529 LVEA is laser SAFE
- 1530 Gerardo and Tyler to LVEA
- 1548 Hugh, Michael R to EX for BRS work
- 1548 Chris out of LVEA heading to all out buildings
- 1551 Dick to LVEA to PSL racks
- 1552 Fil to CER for 60Hz rack isolation
- 1552 Cheryl out
- 1555 Jim to EX
- 1601 Vanessa from EX to LVEA
- 1601 Gerardo, Tyler out. Gerardo to MX
- 1604 Jeff J, Charlie to LVEA to join Bubba
- 1608 Nutsinee to LVEA near HAM6
- 1610 Richard to LVEA to check on access control
- 1611 Karen done at EY
- 1619 Richard out
- 1625 Norco at gate heading to tank 76
- 1637 Chris done
- 1650 Rahul to EX to join SEI crew
- 1651 Gerardo back
- 1652 Norco at gate for tank 79
- 1706 Jeff K to LVEA to check on status of crews
- 1710 Adrian, Matt to LVEA to stage vibrometer
- 1715 Nutsinee out, SEI crew + Rahul back
- 1735 Richard to EY to check on access control
- 1739 Adrian, Matt out
- 1750 Gerardo, Tyler done. Gerardo to MX
- 1753 Hugh, Jim to LVEA to look at H2 tube
- 1753 Richard from EY to EX
- 1759 Chandra to LVEA
- 1802 Bubba and contractor out
- 1802 Chris to LVEA
- 1809 Chris out
- 1811 Chandra out
- 1815 Richard back from EX, heading into the LVEA
- 1825 LVEA laser Hazard
- 1834 Daniel, Nutsinee to LVEA to start SQZ work
- 1847 Gerardo back
- 1856 Jeff K to LVEA to check on crew
- 1905 Pepsi truck at gate
- 1905 Fil out
- 1908 Marc, Matt out
- 1916 Kyle out
- 1918 Dick out
- 1920 Richard to EY
- 1921 Matt to CER
- 1926 Matt out
- 1932 PEM crew, Daniel to LVEA
- 1937 Corey out, LVEA swept
- 1941 PEM crew out
- 1945 Richard back
- 2145 Reached NLN, starting 1 hour of commissioning
- 2225 PEM crew out to LVEA and sweeping LVEA