jeffrey.bartlett@LIGO.ORG - posted 16:02, Sunday 25 August 2019 (51507)
Ops Day Shift Summary
Ops Shift Log: 08/25/2019, Day Shift 15:00 – 23:00 (08:00 - 16:00) Time - UTC (PT)
State of H1: Locked at NLN
Intent Bit: Observing
Support: N/A
Incoming Operator: Travis
Shift Summary: All going well until 17:39 (10:39) unknown lockloss. Wind was coming down at the time and primary microseism was improving. Then the Z-axis shot up to 0.09um/s. It bounced around for about 30 minutes, and then dropped back down to about 0.01um/s. Nothing on USGS or SEIMON.
 
   Relocking has been a bit of a chore so far. Had to work on ALS X several times. After two attempts at DRMI_1F and PRMI states, had to go through CHECK_MITCH_FRINGES to get DRMI_1F to lock. Tweaked PRM and SRM to get a little better buildup.
 
   Things going well until a lockloss at ENGAGE_SOFT_LOOPS. Running buck up through the locking sequence. 
 
   Back in NLN after third attempt. There were no SDF differences to resolve after relocking.
 
After relocking, no further difficulties encountered during the shift.  
 
Activity Log: Time - UTC (PT)
15:00 (08:00) Take over from TJ
17:39 (10:39) Lockloss – Unknown
20:13 (13:13) Relocked at NLN
20:14 (13:14) Back in Observing – NO SDF differences to resolve
20:45 (13:45) Switch to EARTHQUAKE mode for incoming EQ from Columbia
21:01 (14:01) Switch back to WINDY after Columbian EQ passed
23:00 (16:00) Turn over to Travis

 