H1 was was able to ride through a 6.6EQ (it was transitioned to the EARTHQUAKE state). Here is a timeline:
0:05 Verbal for 6.8 EQ (was later listed as 6.6)
- ~0:15 EQ begins to be show up on ndscope, tidal strip tool, and seis blrms.
- 0:22 L1 goes down
- 0:30 H1 to EARTHQUAKE state
- 0:32 V1 goes down
- 1:06 R-wave begins to roll through as predicted
- 1:35 R-wave mostly gone
- 1:54 Transition back to WINDY state
- 1:58 Transitioned back to EARTHQUAKE since H1 started to have many glitches, tidal signals increased and ASC Control signals increased....will give it more time.
Attached is a screenshot of the desktop after the R-wave rolled through.