TITLE: 08/28 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Corey
SHIFT SUMMARY: in Observe and then Calibrations and during an offset test, H1 lost lock, JeffK and others looking into it
LOG:
- 17:15 - Peter out of the optics lab
- 17:52 - Vanessa to MX
- 20:17 - Rick to optics lab
- 22:14 - Peter to optics lab
- ~22:20 - fire drill
- current Site status:
- MX: Gerardo and Kyle at MX
- H2 building: DaveB
- relocking H1:
- relocking X arm required manual alignment after locking at a reasonable value, but not surviving the WFS
- aligned X arm in SLOW_NO_WFS
- returned to ETM_TMS_WFS_OFFLOADED, was successful
- first try at DRMI did not grab
- manually went to CECK_MICH_FRINGES, minor tweaks to BS pitch and yaw
- on to PRMI, first time, successful
- returned to DRMI, fire drill, it had locked at good numbers, but hadn't held, when I returned from the fire dril
- end of fire drill, in AQUIRE_DRMI_1F, I aligned SRM, a few clicks in pitch, about 6 in yaw, and DRMI locked
- DRMI held sthrough most of the WFS, but lost lock right before getting to OFFLOAD_DRMI_ASC
- handed off to Corey,
- Current Status: H1 is currently in ENGAGE_SOFT_LOOPS
PLANS FOR TOMORROW: 8 hour break for HEPI pump and VAC work at MX