TITLE: 08/29 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
OUTGOING OPERATOR: Ed
CURRENT ENVIRONMENT:
SEI_CONF state: LARGE_EQ_NOBRSXY
Wind: 6mph Gusts, 5mph 5min avg
Primary useism: 1.89 μm/s
Secondary useism: 3.23 μm/s
QUICK SUMMARY: L2A complete. GV14 and GV15 closed for mid X turbo pump work. End X HEPI pump replacement starting. 6.4 mag earthquake 276km WNW of Bandon, Oregon.