H1 CAL (CAL)
richard.savage@LIGO.ORG - posted 10:08, Thursday 29 August 2019 (51605)
Fit check of Ncal drill fixture at Xend

Dripta Bhattacharjee, Ethan Payne, RickS

We did a fit check of the drill fixture for the NCal mount at Xend this morning (see attached photos).

Everything look good - about 1/16" to 1/8" horizontal play between the inside surfaces of the drill bushings and the pylon surface, with the ability to adjust the orientation and location slightly with the set screws.

We took the fixture back to the Ncal space in the optics lab.

The plan is to wait until the Ncal support is ready, then do a fit check of the support in early October when Timesh Mistry is here, before drilling and tapping the pylon.

 

Images attached to this report