TITLE: 08/29 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Preventive Maintenance
INCOMING OPERATOR: Ed
SHIFT SUMMARY:
Took the first half of the shift to finish Thursday Maintenance Full Day & then about 2.5hrs to recover from it (which honestly wasn't very bad considering--H1 wanted to get back into Observing!).
NOTE: Teamspeak is down due to planned power outtage at MIT. Should be back around 4am PDT. So in the meantime phone other Control Rooms, when needed.
LOG:
- LVEA transitioned to Hazard and swept (Corey)
- 0:30 1st gate valve closed (GV15)
- 0:34 2nd gate valve closed (GV14)
- 0:34-1:56 Initial Alignment begins
- 0:42 Paused Green arm locking
- 0:44-1:17 Sheila/Keita touch up COMM Beat note out on ISCT1 (needed after PeterK's ALS path work on the PSL earlier today)
- 1:57 Lock #1
- Tried CHECK_MICH_FRINGES because TJ was still here and wanted to see how it looks nowadays.
- For CHECK MICH FRINGES, my experience (last month) was that we want a dark & symmetric spot made by moving the BS
- Tonight, we had a bright spot on AS AIR. This looked new. So, I did not touch the BS & we just moved on.
- 2:24 GRB received (we were not Observing)--discovered Teamspeak was down, so called LLO.
- 2:55 Back to Observing
- 5:00-5:02 TCSy CO2 laser drops us out of observing.
- 6:07 VERBAL EQ notification for Atlantic EQ of magnitude 5.7 (but i'm seeing it listed as 5.2)
- 6:08 Transition to EARTHQUAKE
- 6:54 Back to Windy
- 6:24 GRB notice received from FERMI & will Stand Down until 6:39 (phoned LLO to let them know & update them on power outage affecting Teamspeak)