TITLE: 09/03 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 119Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY: A relatively quick recovery from maintenance, but then a bit of commissioning and odd couple of lock losses slowed us down from getting to Observe.
LOG:
- 1500 Richard to Ex for ALS camera housing replacement
- 1530 Ace at the gate
- 1538 Richard back, Shiela starting measurement
- 1546 Hugh, Jeff B to EX, EY to check on HEPI and Dust monitors
- 1548 Fil, Peter to LVEA to isolate racks
- 1600 Lock loss
- 1602 Karen to EY
- 1603 Chris and pest control in LVEA
- 1603 Rahul starting charge meas.
- 1603 Tyler to LVEA to start craning
- 1608 Vanessa to EX for cleaning
- 1610 TJ LVEA Transition to safe
- 1614 Sheila takes IMC to OFFLINE
- 1616 Patrick to LVEA to see if Fil needs any help
- 1618 TJ turns on PA system
- 1625 Cris and pest out
- 1625 Patrick out
- 1629 Bubba to LVEA to help with craning
- 1632 Hugh, Jeff B done
- 1635 Gerardo to LVEA to start turbo pump install
- 1701 Karen done
- 1724 GRB
- 1728 Vanessa, Karen to LVEA
- 1732 Richard to EX to turn off WAP
- 1732 Chris to LVEA to assist in craning
- 1741 Norco at gate to tank #80
- 1753 Richard back from EX, VEA swept
- 1758 Gerardo done
- 1806 Gerardo taking forklift around corner station
- 1808 Pest done
- 1818 Hugh to LVEA for H2 fit checks
- 1818 Jeff J to LVEA to join craning
- 1829 Hugh out
- 1833 Jeff K to LVEA to inform
- 1846 Jeff Jones out
- 1848 Bubba, Tyler, Chris out
- 1901 Fil, Peter out
- 1903 Betsy to LVEA to sweep
- 1905 Gerardo done
- 1912 Betsy out, LVEA swept
- 1926 Christina to Ex to grab Norco receipt
- 1926 Initial alignment complete
- 1939 Christina back
- 1959 Lock loss at Maximun_power. Commissioner caused
- 2005 Chandra, Tyler to MX, MY
- 2027 Gerardo to MY
- 2033 Lock loss at Increase power. Unknown reason.
- 2226 Observing