thomas.shaffer@LIGO.ORG - posted 16:03, Wednesday 04 September 2019 (51733)
Ops Day Shift Summary
TITLE: 09/04 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC STATE of H1: Calibration INCOMING OPERATOR: Cheryl SHIFT SUMMARY: 8.5 hour lock. Calibration measurements are finishing up. LOG: