16:11 Lockloss Intention bit Commissioning
16:12 Re-Lock attempt 1 - H1 as-is.
- Green re-locked
- X is a little weak- going to try a tweak
- having a lot of trouble recovring X-Arm power with just ETM and TMS - going ro IA (H1 has been locked for 26+hrs)
- ND scope and Dataviewer BOTH seem to be very laggy which made using them a little daunting. I really had to "slow my roll" trying o adjust the x-beam.
- there is ~10 sec lag between action and result -_- (actually, more like 20)
- Dave reported nothing indicating why this should be happening. I'll reboot the workstation i'm using.
17:00 Re-Lock attempt 2
- DRMI alignment didn't turn out so good. Went to PRMI
- PRMI command didn't respond to my clicking - Took ISC_LOCK to down ad started it again (i'm wondering if it's related to the slowness I experienced with the data monitoring tools)
17:11 Re-Lock attempt 3
- Lost it at ENGAGE_ASC_FOR_FULL_IFO
17:42 Re-Lock attempt 4
- paused for a few minutes @ ENGAGE_ASC_FOR_FULL_IFO
- moved to ENGAGE_ISC and held for a few minutes
- at ENGAGE_SOFT_LOOPS and after a litany of saturations the lock failed.
18:00 ReLock attempt 5
- paused for a few minutes @ ENGAGE_ASC_FOR_FULL_IFO. Then moving straight to DC_READOUT.
- I got the extensive litany of saturations again but then it ceased....
- parked it at DC_READOUT for a rew and lost the lock. GRRRR!
18:32 ReLock attempt 6
- no parking this time. Going to try the full Monty
- lost it at CHECK_AS_SHUTTERS
18:40 Re-Lock attempt 7
- same approach as last
- lock loss at trying DRMI - i'm suspectin te IMC at this point
- lunch time
- 19:19 NLN - Intention Bit Observing