TITLE: 09/10 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Niko
SHIFT SUMMARY:
Maintenenace went well. Squeezer Table work went a litle long due to a cable issue. Recovery locking has been unsuccessful for the remainder of my shift. Handing of to Niko.
LOG:
15:00 Bubba out to move bees
15:01 Sensor Correction turned off
15:01 Karen out to EY
15:02 Richard and Ken out to LVEA then out to X-Arm to survey for future PEM work
15:03 Jeff B to outbuildings to check Dust monitor pumps, HEPI pumps and TCS
15:08 PCal team to EX
15:25 Vanessa out to LVEA
15:40 Fil out to LVEA
15:45 TJ to LVEA
15:52 TJ out
16:01 Bub, Ty, and Chris out to LVEA ot start craning
16:06 Rich and Ken back from x-arm
16:08 Jeff B back
16:12 Karen headed back
16:!6 H1 unlocked - holding t DOWN for teh duration of maintenance
16:21 Norco on site - dewar 75 Y-Corner
17:00 Jim out to LVEA to deliver parts to HAM6 area
17:16 Hugh and contractor out to EX for Wind Fence
17:16 EX LASER SAFE - PCal team done
17:21 TJ out to LVEA for TCSY investigation
17:41 Richard out to LVEA for physical measurements
17:49 TJ back
18:00 Ethan back from a return trip to EX to disable WAP
18:35 Jeff K out to LVEA to check on maintenance progress
18:37 Bubba is back - Chris and Tyler still out
18:46 Chris and Tyler back
18:49 Jason running rotation stage calibration script - about 5 minutes
19:07 Begin Initial Alignment
19:15 Hugh back
19:09 Sensor correction turned back ON
19:27 Initial Alignment finished - Re- locking attempt 1
19:49 Fil back
20:?? Jim and Fil out to EX during EQ TOO for BRS tuning
21:05 Daniel back
21:35 Initial Alignment
22:20 Kyle to X-mid