Ops Shift Transition: 09/12/2019, Eve Shift 23:00 – 07:00 (16:00-00:00) - UTC (PT)
State of H1: Locked
Intent Bit: Commissioning
Weather: 0-15 mph wind
Primary 0.03 – 0.1Hz: 0.01 um/s
Secondary 0.1 – 0.3Hz: 0.1 um/s
Outgoing Operator: Jim
Quick Summary: Locked and Observing for 18 hours.