Reports until 16:00, Saturday 14 September 2019
H1 General
travis.sadecki@LIGO.ORG - posted 16:00, Saturday 14 September 2019 (51949)
Ops Day Shift Summary

TITLE: 09/14 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 110Mpc
INCOMING OPERATOR: TJ
SHIFT SUMMARY:  Observing for the entire shift.  No issues.
LOG:

16:37 SEI to EQ mode for Timor-Leste quake

18:19 SEI back to WINDY

20:40 Kyle to MX

20:57 Kyle back, working in high bay terminating cables

20:30-21:30 3 tour groups through CR