Reports until 16:00, Monday 16 September 2019
H1 General
travis.sadecki@LIGO.ORG - posted 16:00, Monday 16 September 2019 (51969)
Ops Day Shift Summary

TITLE: 09/16 Day Shift: 15:00-23:00 UTC (08:00-16:00 PST), all times posted in UTC
STATE of H1: Observing at 115Mpc
INCOMING OPERATOR: Ed
SHIFT SUMMARY:  Locked for the entire shift. 
LOG:

16:31 Ethan to optics lab, Karen to MY

17:27 Ethan out

18:09 Karen back

21:00 JeffK starting calibration measurements

21:38 Dave to EY looking at Dolphin switch

22:01 Dave back

22:33 Observing