TITLE: 09/17 Eve Shift: 23:00-07:00 UTC (16:00-00:00 PST), all times posted in UTC
STATE of H1: Lock Acquisition
INCOMING OPERATOR: Cheryl
SHIFT SUMMARY:
Shift went well until lockloss. The Log below is the current state.
LOG:
5:37 SR2 saturation - lockloss
5:39 Re-locking attempt -1
- a little touch-up on both ETMS
- first PRMI ASC dropped off - waiting for second lock to continue improving
- something looks misaligned
- checked mich fringes and went back to PRMI
- Alignment still looks bad going to go try and initial align SRC only
- SR2 was quite positive in PIT and a little negative in YAW. SRC error signals are revealing some pretty poor alignment
6:16 Re-locking attempt - 2
- with a fresh SRC align and PRMI haveing been optimized, let's see what happens.
- DRMI locked in less tha a minute
- Fell off at CARM_TO_TR
6:28 Re-locking attempt - 3
- Lost it at ENGAGE_ASC_FOR_FULL_IFO
6:49 Re-Locking attempt - 4
- Handing off to Cheryl at PREP_ASC_FOR_FULL_IFO