TITLE: 09/17 Day Shift 15:00 – 23:00 (08:00-16:00), all times posted in UTC
STATE of H1: Observing
INCOMING OPERATOR: Ed
SHIFT SUMMARY: Not too invasive maintenance, ended around 12:30. Went into Observing at 2:00. Wind is high, but we're still locked locked at ~114 Mpc.
LOG:
15:00 (08:00) Start of shift
15:00 (08:00) Kyle to LVEA -- turn on Kobelco pump
15:01 (08:01) Hugh to LVEA -- material organization
15:13 (08:13) Dan to LVEA -- test wifi
15:20 (08:20) Bubba, guest to LVEA -- look at cranes
15:27 (08:27) Richard back from EX
15:28 (08:28) Richard to LVEA -- join tour group
15:35 (08:35) Hugh back from LVEA
15:35 (08:35) Gerardo to LVEA -- check with Kyle
15:47 (08:47) Hugh to EX -- pull down wind fence auxiliary sensors
15:48 (08:48) Matt to LVEA -- mount accelerometer outside HAM3
15:49 (08:49) Betsy to LVEA -- find tour group
15:54 (08:54) Gerardo to back from LVEA
15:54 (08:54) Gerardo to MX -- turn on purge air
15:58 (08:58) Jeff Jones, visitor to EX, EY, roof for ecological survey
16:03 (09:03) Marc, Adrian to LVEA -- catch up with touring group
16:10 (09:10) Chandra to LVEA -- meet with touring group
16:14 (09:14) TJ to LVEA -- get verbal, key off TCSY laser
16:19 (09:19) Ken to EX -- continue PEM supports installation
16:26 (09:26) Matt out of LVEA
16:28 (09:28) Tyler to LVEA -- find Chandra
16:31 (09:31) Betsy out of LVEA
16:33 (09:33) Karen leaving EY
16:39 (09:39) Chris to LVEA -- set up eye wash signs/do safety checks
16:40 (09:40) Touring group members out of LVEA
16:43 (09:43) Vanessa back from MX
16:43 (09:43) Vanessa to LVEA
16:52 (09:52) Bubba out of LVEA
16:58 (09:58) Marc, Adrian, Gavin to CER
17:00 (10:00) Fil to LVEA -- fiber pulling
17:08 (10:08) Chandra out of LVEA
17:08 (10:08) TJ to LVEA -- TCSY chiller replacement
17:14 (10:14) Jeff to CER -- check on CER work after computer error
17:20 (10:20) Jeff back from LVEA (?)
17:21 (10:21) TJ to LVEA -- turn on CO2Y
17:25 (10:25) TJ back from LVEA
18:00 (11:00) Fil back from LVEA
18:02 (11:02) Hugh back from EX
18:09 (11:09) Jeff Jones, visitor done with survey
18:22 (11:22) Gerardo back from MX
18:23 (11:23) Tyler out of LVEA
18:24 (11:24) Chris out of LVEA
18:24 (11:24) Chris to EX, EY -- put up eye wash signs in VEAs
18:32 (11:32) Chandra to LVEA -- spin down turbo
18:35 (11:35) Rich, Adrian, Daniel, Kara to CER -- look at electronics
18:39 (11:39) Sheila out of Optics Lab
18:44 (11:44) Tyler done with high bay work
18:51 (11:51) Gavin, Marc, Adrian back from CER
18:53 (11:53) Chris back from end stations
18:55 (11:55) Daniel, Kara, Rich out of CER
18:57 (11:57) Ken done with EX work
19:03 (12:03) Fil done at EX, EX swept
19:03 (12:03) Kyle, Chandra out of LVEA -- ToO fan turn off in 1-2 hours
19:18 (12:18) Starting initial alignment
19:48 (12:48) Initial alignment complete, starting re-lock
20:11 (13:11) Lockloss from CARM_TO_TR
20:40 (13:40) Kyle to LVEA -- turn off fan
20:45 (13:45) Chris to halfway to MX -- drop off cable for bee-movers
20:48 (13:48) Kyle out of LVEA
21:00 (14:00) Locked at NLN, accepting sdf changes and going into Observing
21:06 (14:06) Chris back from cable drop-off
23:00 (16:00) End of shift